West Side Rooftop

West Side Rooftop

Our large scale installation of sedum mats act as a roof drainage system, helping to lessen the effects of runoff on the city sewer system

 

This project was installed to help mitigate the effects of stormwater runoff on Buffalo’s combined sewer system. It is approx 3,000 sq ft of pregrown sedum mats growing on over 3 1/2″  of a custom, locally produced growing medium. By putting a green roof on this building the owners have drastically reduced its impact on the combined sewer system.